Compare the current and target configurations
Start with a platform inventory and a description of the intended change. Mark components that will be retained, replaced or added. This makes it easier to identify dependencies and avoid ordering a module without the carrier, riser or cable its installation needs.
Request preparation checklist
| Area | Include or confirm |
|---|---|
| Baseline | Machine type, board and processor configuration, existing memory, storage, expansion devices and firmware. |
| Target | Required capacity or function, installation constraints, workload context and allowed alternatives. |
| Dependencies | Supported memory population, slot and bay allocation, controller and backplane, power, cooling and mounting parts. |
| Approval | Exact references, compatibility evidence, installation owner, maintenance window and acceptance criteria. |
Review and acceptance boundary
Review each proposed substitution against the full configuration. Preserve exact-part requirements when the platform documentation or maintenance policy makes them necessary; do not silently replace those constraints with a generic technology description.
